March 2024

Bakery Upgrade

At a well-known bakery in George, Western Cape, Jaclin Engineering was contracted to upgrade the heating and humidity system of their baking proofer. The old system used electric heating, with very little air circulation, resulting in capacity and bread quality problems.

Jaclin Engineering designed and built and installed a complete steam heating system comprising of two pressure reducing stations, complete stainless steel ducting system with circulation fan, heat exchanger and steam reticulation system from the client’s new boiler.

The result was massively increased baking capacity, efficiency, quality of bread and significant energy savings. The full upgrade was installed it all during a planned shut, causing no downtime for the Bakery.

November 2023

Steam to Pelleter

At a well-known animal feeds manufacturer in Paarl, Cape Town, Jaclin Engineering installed the steam supply and control station to their new state-of-the-art conditioning system on one of their pelleters.

September 2023

Paraffin Ring-Main

At a well-known breakfast cereal manufacturer in Atlantis, Jaclin Engineering designed and installed a new paraffin ring-main system for their new boiler. Our scope included a full ring-main with new pumps with spark-proof motors, valves and filters.

April 2023

Steam Line Repair

At an upmarket brand clothing manufacturer in Atlantis, Jaclin Engineering pointed out a potential catastrophe during a routine steam system audit. Their main steam and condensate lines of ±60m in length, which are suspended on poles above the ground was close to collapsing due to poor design, lack of allowance for expansion and water hammer.

Jaclin Engineering firstly propped up the pole supports to prevent them from further collapse. We then cast new concrete bases into the ground with new pole stubs. Over the Easter weekend shut of the factory, the distorted steam and condensate lines were removed from the poles, poles were cut off and fitted into the new bases, and the steam and condensate lines replaced. New pockets and flexible hoses were added for drainage and expansion. All of this remedial action was carried out without any lost time to the business.

February 2023

Chimney Repair

At a well-known bakery in Salt River, Cape Town, an existing stainless steel chimney on one of their ovens cracked and kinked on its 45⁰ bend and fell over due to high winds and broken guy ropes. Jaclin Engineering pre-fabricated a new flanged stainless steel bend section, removed the damaged chimney by means of a mobile crane, repaired it and re-installed it all during an 8-hour planned shut of the baking line, causing no downtime for the Bakery.

September 2022

Full Steam System Audit

Jaclin Engineering was contracted by Actom John Thompson to conduct a full Steam System Audit at one of the biggest Tuna factories in the world, based in Victoria, Seychelles

Our scope of work included:

  • Energy savings relating to steam trapping and the removal of condensate in the system.
  • Tagging and testing the existing steam traps using our advanced software-based ultrasonic and infra-red steam trap testing equipment.
  • Evaluation of the safety and efficiency of the entire steam reticulation system, as well as all steam-related machinery and equipment.
  • Highlighting any parts of the system that do not conform to sound and accepted engineering practice.
  • Providing a detailed report that reflects the steam trap population, trap failure rate, exact steam losses with recommendations and remedial actions for all our findings.
  • Evaluation of entire steam usage, line sizing and methods of saving steam.
December 2021

Steam Supply to Pelleters

At an animal feed manufacturer in Upington, Northern Cape, Jaclin Engineering re-designed and replaced a section of the main 100mm steam supply line as well as valves, pressure-reducing valves, separators, control valves and steam traps on the steam supplies to their two Pelleters. With careful planning, sections of the pipework were pre-fabricated and the installation and tie-in was done over a single weekend, causing no lost time for the factory.

April 2021

Chimney Stack

At a well known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering manufactured and installed a new chimney stack for the client’s HFO fired boiler. The new boiler stack was fully manufactured and lagged on site, and installed on a Saturday. Only at the time the old stack was removed and lowered to the ground, it was discovered that it was severely corroded and close to failure. This entire project was carried out with no interruption to the client’s production process.

September 2019

Steam Header

At a well-known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering designed and manufactured a fully certified steam header for their boiler house, to replace a rotten 20- year old one. The new header was built to the exact dimensions of the old one, so as to minimise the need for pipework modifications.

The new header was equipped with a full set of Zetkama isolating globe valves and an Ari steam trapset, which Jaclin Engineering holds the agency for as a distributor.

September 2019

Hotwell

At a well-known animal feeds manufacturer in Paarl, Cape Town, Jaclin Engineering designed, manufactured and installed an 8000 litre 3CR12 hotwell tank for their boilers. The tank is equipped with state-of-the-art ultrasonic level control, a sparge pipe and direct steam-injection heating.

This turnkey project included the design and casting of the concrete bases, the design of the 3m high stand and catladder, as well as the tank. The tank and stand were manufactured in our workshop, lagging and cladding was fitted and installation and tie-in on site was all completed on one day.

January 2019

Boiler Installation, Refurbishment and Statutory Inspection

At a juice manufacturer in Montague Gardens, Jaclin Engineering was awarded the tender for a standby boiler plant, which included:

  • Installation of an older boiler that was re-located by Jaclin Engineering two years prior
  • Stripping and sandblasting of the boiler shell
  • Full statutory inspection of the boiler
  • Re-lagging and cladding as well as installation of the 22m high chimney stack
  • Re-lagging and cladding of the boiler
  • Design, manufacture and installation of a fully certified NB150 steam header that ties into the existing boilerhouse manifold
September 2017

Chimney Stack

At a well known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering conducted thickness testing on both the existing boiler chimney stacks, by use of a mobile crane to access the full height of the chimneys. The coal boiler stack was found to be severely corroded and the wall thickness very thin towards the top. Jaclin Engineering manufactured and installed a new chimney within a short space of time, preventing a potential disaster of the old chimney collapsing.

May 2017

Boiler Move

At a well known dairy in Epping, Cape Town, Jaclin Engineering removed a 8 ton/hour boiler from their boiler house and relocated it to their other factory in Montague Gardens.

August 2023

Compressor Room

A well-known potato chip manufacturer in Lamberts Bay, West Coast needed to improve on the quality of their compressed air. Jaclin Engineering designed, supplied and installed a new dryer and filters as well as a complete compressor room reticulation system and tied into the existing airline into the factory.

December 2022

Compressor Room

A well-known corrugated carboard manufacturer in Epping, Cape Town purchased a new compressor, dryer and filters to supply compressed air to the existing production facility that had outgrown the available compressed air capacity from the older compressors. Jaclin Engineering designed and installed of a complete compressor room reticulation system and tied into the existing airline into the factory.

December 2022

Compressed Air System

A well-known manufacturer of food packaging in Atlantis, Cape Town purchased two new compressors, a dryer and filters to supply compressed air to the existing production facility that had outgrown the compressed air availability from the older compressors. Jaclin Engineering designed and installed of a complete compressor room reticulation system which allows the flexibility of running any combination of the new and existing compressors and dryers, as well as a new 100mm airline into the factory.

August 2022

Compressor Room

One of the largest wholesale clothing suppliers in SA, established a Distribution Centre with a Cutting Department Airport Industria, Cape Town. Jaclin Engineering was awarded the tender for the design and installation of the complete air system which included a new compressor room as well as a complete reticulation system feeding the Cutting Room. The compressor room equipment that Jaclin installed was a new compressor, dryer, receiver, filters and exhaust ducting.

July 2022

Compressor Room

A well-known corrugated carboard manufacturer in Faure, Cape Town purchased a new upsized compressor, dryer and filters to supply compressed air to the existing production facility that had outgrown the air capacity from the older compressors.

Jaclin Engineering was awarded the tender for the re-design and installation of an upsized compressor room reticulation system which allows the flexibility of running any combination of the three compressors, two dryers and two air receivers.

February 2022

Compressor Room

At a well-known bakery in Bellville South, Cape Town, Jaclin Engineering upgraded the compressor station by installing a new 75kW compressor, air dryer as well as a separator and pre- and after- filters. An old compressor and two air dryers were removed, pipework and exhaust ducting was stripped out, and replaced with new. Jaclin Engineering took care of the entire project, from rigging-in of the new equipment to installation, pipework and ducting, with no interruption to the client’s production.

January 2022

Compressor Room

At a flexible packaging manufacturer in Strand, Cape Town, Jaclin Engineering upgraded their compressor room.

  • The piping system was re-designed and upsized to maximise on the client’s investment in a new compressor.
  • Jaclin took care of the rigging-in of the new compressor, complete pipework installation and exhaust ducting for the new compressor.
April 2021

Compressed Air System

At the new premises of an exclusive manufacturer and exporter of cycling apparel in Woodstock, Cape Town, Jaclin Engineering designed, manufactured and installed a complete compressed air system. The client’s existing compressors and filters were installed into a new compressor room, and an overhead ring-main system was installed to provide dry air to the seven rows of workstations. We also designed and installed a blowdown system and vessel for the client’s portable boilers on their ironers .

January 2021

Compressed Air System

A leading producer of personal, baby and home care products re-located its production facility to new premises in Epping, Cape Town. Jaclin Engineering designed and installed a complete compressed air ring-main piping system to supply all the production machinery with sufficient volume dry air. The client’s existing compressors, dryers and air receiver were all piped up in the new compressor room, and tied into the new ring-main.

January 2021

Compressor Station

At a well-known chicken processing plant in Hocroft, Cape Town, Jaclin Engineering upgraded the compressor station by installing two new 200kW compressors, two dryers as well as separators and pre- and after- filters. The two existing compressors and dryers were removed, pipework and exhaust ducting was stripped out, and replaced with new. Jaclin Engineering took care of the entire project, from offloading of the new equipment to installation, pipework, ducting and panelling, all with no interruption to the client’s production.

September 2020

Compressor Station

At a well-known textile manufacturer in Elsies River, Cape Town, Jaclin Engineering upgraded the compressor station by installing a new 160kW compressor, dryer as well as a separator and pre- and after- filters. The existing compressor and dryer were removed, pipework and exhaust ducting was stripped out, and replaced with new. Jaclin Engineering took care of the entire project, from offloading of the new equipment to installation, pipework, ducting and a false ceiling, with no interruption to the client’s production.

May 2020

Compressor Station

At a well-known food manufacturer in Montague Gardens, Cape Town, Jaclin Engineering corrected a fundamental problem with the pipe sizing between the compressors, filters, dryer and air receiver.

The client had sufficient compressor capacity installed, but due to incorrect pipe sizing in the compressor station, there was an air volume shortage in the plant where the retorts were installed – fed by a line of ± 300m in length. By simply upsizing the pipework and header in the compressor room, the problem was solved and the VSD controlled compressor now runs at a noticeably lower speed, which results in an electrical power saving.

September 2019

Compressor Room

At a well-known towel manufacturer in Strand, Cape Town, Jaclin Engineering redesigned and corrected the pipework in their compressor room. We also re-located an existing compressor and air receiver, as well as installed a new dryer and pre and after filters, as well as exhaust ducting.

November 2018

Compressor Station Revamp

At a fruit juice manufacturer in Montague Gardens, Cape Town, Jaclin Engineering re-designed and revamped the entire compressor station, which included:

  • Re-locating of compressors
  • Replacing of undersized filters with correctly sized and appropriate filters
  • Re-located air receivers
  • Installed compressor exhaust air ducting
  • Supplied and installed auto-drains
  • Installed a new NB80 stainless steel main airline throughout the factory

The result is clean, dry air at the right pressure and enough volume to handle peak demands from certain processes.

June 2018

Compressor Station

At a local plastic packaging manufacturer in Triangle Farm, Cape Town, Jaclin Engineering stripped out an entire compressor station and installed two new compressors, an air dryer, filters and a complete new pipework system – all over a single weekend.

February 2017

New Compressor Room Pipework

At a well known textile manufacturer in Elsies River, Cape Town, Jaclin Engineering designed and installed a complete stainless steel piping system to connect a new compressor, dryer, filter sets and air receiver.

February 2022

Compressor Air, Fuel and Solvent Pipework

At a well-known flexible packaging manufacturer in Triangle Farm, Cape Town, a devastating fire destroyed a major section of their factory. Jaclin Engineering was awarded the tender for stripping out the fire-damaged compressed air, fuel and solvent pipework, and replacing it once the fire-damaged building had been re-constructed.

January 2022

Service to New Retort

At a well-known baby food manufacturer in Ndabeni, Cape Town, Jaclin Engineering designed and installed all the utilities for a new retort, including steam, condensate, cooling water, drainage, compressed air and vent lines.

September 2020

Services to new retort

At a well-known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering designed and constructed a new floor slab on which the client’s new retort was to stand. We also designed and installed all the utilities for the retort, including steam, condensate, cooling water, drainage, compressed air and vent lines. All of the above services were installed and tied-in over a single weekend.

May 2020

Retort Replacement Project

At a well-known food manufacturer in Montague Gardens, Cape Town, Jaclin Engineering successfully carried out a retort replacement project. We removed one of two existing retorts and installed a newer larger one in its place. The scope of the project included:

  • Blanking off of all utilities and services that supplied the old retort.
  • Removal and rigging out of the old retort.
  • Screening-off of work area so production on the remaining retort could continue uninterrupted and safely.
  • Construction of floor drains for the new retort.
  • Rigging and installation of the new retort.
  • Design, manufacture and installation of a new fully certified steam header, and condensate header with new take-offs for the existing and new retorts.
  • Design, manufacture and installation of new compressed air system to supply both retorts, including a new 3m3 air receiver.
  • Design, manufacture and installation of new chilled water lines, to supply both retorts.
  • Upgrade of the existing chilled water system to cater for the new bigger retort (pump, storage tanks).

Pre-fabrication of all of the above was carried out off-site during weekdays, with all installation and tie-in over weekends so that the client’s production was completely uninterrupted.

June 2019

Corrugated Cardboard Manufacturer

A well-known corrugated cardboard manufacturer recently moved an older corrugator from their Cape Town facility to a new factory in Port Elizabeth, and Jaclin Engineering was awarded the tender for:

  • Manufacture and installation of a new 5,000 litre hotwel.
  • Design, manufacture and installation of a fully certified NB100 steam line, a NB80 HP condensate return line, and a NB50 LP condensate return line.
  • Design, manufacture and installation of HFO, starch, compressed air, water and effluent reticulation systems.

Jaclin Engineering’s teams were on site in PE for over a month and met the deadlines necessary for timeous start-up of the corrugator.

July 2018

Fresh Water Storage System

At a local juice manufacturer in Montague Gardens, Cape Town, Jaclin Engineering designed and installed a water storage system for the client which enables them to store 400,000 litres of fresh water for their process, to minimise the risk of water cuts disrupting their production process during the drought in the Western Cape.

February 2018

Corrugated Cardboard Manufacturer

At a brand new corrugated cardboard manufacturer’s factory, in Faure, Cape Town, Jaclin Engineering was awarded the tender for:

  • Transport, installation and pressure testing of a new 10 ton/h HFO fired boiler from John Thompson.
  • Transport and installation of a new 29m long chimney stack from John Thompson.
  • Manufacture and installation of a new 10,000 litre hotwell.
  • Design, manufacture and installation of a fully certified NB150 steam line and two NB80 condensate return lines.
  • Design, manufacture and installation of HFO, starch, compressed air, borehole water, RO water and effluent reticulation systems.
  • Design, manufacture and installation od a 14m span latticed pipe bridge.

Jaclin Engineering’s teams were on site for more than 4 months, and met the deadlines necessary for timeous start-up of the new corrugator.

November 2021

Pharmaceutical Company

One of the largest Pharmaceutical Companies is SA, based in Epping, Cape Town required two packaged thermal oil/glycol heat exchanger skids as an improvement to their process.
Jaclin Engineering was awarded the tender for:

  • Manufacture and installation of two complete stainless-steel skids to house the heat exchangers, pumps and valves.
  • The on-site installation included stub-ins into existing thermal oil pipelines by our coded welder, and intricate pipework to best utilise the limited space available.
July 2021

Cooling Water Recycling System

At a well known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering designed, manufactured and installed a complete stainless steel cooling water recycling system for the client’s retorts in the factory.

  • The old system that was in place, partially recovered some of the retorts’ cooling water, while the rest was dumped down the drain at the end of each retort’s cooling cycle.
  • The scope of this project included manufacture, supply and installation of a new 10,000ℓ storage tank as well as new drain and supply lines to all the retorts, all in Grade 316L stainless steel.
  • Jaclin Engineering took care of this turnkey project by removing the old system and tanks, installation of the new system, pipework, pumps and controls. The full installation took place over a weekend, with no interruption to the client’s production process.
May 2020

Retort Cooling Water System Upgrade

At a well-known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering designed and implemented an improvement to the existing cooling water system. Originally the retort cooling water circuit was in series with the cooling tower water circuit.

After adding an additional retort, and during warm ambient temperatures, the client struggled to cool down the retorts and reduce the temperature of the water in the bulk tank, resulting in slower batch cooling times on the retorts.

We designed and implemented a separate cooling tower water circuit with its own dedicated pump. This resulted in the cooling water circuit to the retorts to become a separate circuit and the contents of the bulk water tank is now cooled constantly by the dedicated circuit to the cooling towers. This simple improvement resulted in far better batch times and improved efficiency on retort production.

April 2018

Cooling Water System

At a well-known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering re-located a cooling water tank, water coolers and duel pump station. The NB150 cooling water pipework was re-designed, manufactured and installed.

September 2023

Warm Water Reclamation Plant

A well-known potato chip manufacturer in Lamberts Bay, West Coast needed to recover and recycle the huge volume of warm rinse-water from their process. Jaclin Engineering designed, supplied and installed a complete warm water reclamation plant which enabled them to re-use their warm rinse water over and over, a few times before dumping it down the drain.

The warm rinse water is stored in tanks, filtered, and pumped back into the plant for re-use. Since the installation of the new plant, the client has realised huge savings on water and steam, which assists them in maintaining their market edge.

Jaclin’s scope of work included:

  • 2 x 10,000ℓ stainless steel tanks.
  • Warm water pumps and valves.
  • Stainless steel and PVC pipework.
  • An automatic backwash filter.
  • Full electrical controls, level control and automation.
  • Tie-in existing waterline into the factory.

The entire plant was constructed and commissioned during the one-week annual shut of factory, causing no downtime at all.

October 2022

Warm Water System

A well-known fruit juice manufacturer in Airport Industria, Cape Town had an existing 20,000 litre calorifier with failed and leaking steam coils inside and a poorly designed and functioning steam system, which resulted in significant production losses and downtime due to insufficient warm water.

Jaclin Engineering was called in to assess and carry out the necessary repairs and modifications to the warm water system to ensure adequate warm water volumes and temperatures for the production demand. We installed a manhole onto the top of the tank, repaired the cracked steam coils and corrected the steam system over a single weekend, which solved the client’s warm water problems that had been plaguing them for months.

May 2021

Warm Water System

At a new polyester (PET) recycling plant in George, Western Cape, Jaclin Engineering designed, manufactured and installed a complete new warm water system, to provide water at 95⁰C for the recycling process.
The scope of the project included:

  • Design and manufacture of a 5000ℓ mild steel water storage tank complete with heating coil.
  • Supply and installation of a 300kW wood-fired water heater.
  • A complete supply and return warm water piping system between the water heater and storage tank, and between the storage tank and recycling plant.
  • Supply and installation of hot water circulation pumps for both water circuits.
May 2019

Thermal Oil System at Textile Manufacturer

A well-known textile manufacturer in Elsies River, Cape Town, Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a fully certified NB200 thermal oil reticulation system.
  • Design, manufacture and installation of the steel structures that supports the new thermal oil lines.
  • Installation of the new thermal oil heater, expansion tanks, pumps and ancillary equipment.
  • Installation of the chimney stack for the new thermal oil heater.
May 2017

Hot Oil Vapour Piping System

At a well known spunbond nonwoven textile manufacturer in Atlantis, Cape Town, Jaclin Engineering installed the pipework system for a hot oil vapour system for a new spunbond nonwoven textile production line. All pipework was installed in compliance with SANS 347 and the Pressure Equipment Regulations.

March 2022

Forklift Loading Platform

A well-known corrugated cardboard manufacturer in Faure, Cape Town required an extension of their forklift loading ramp and platform. Their existing ramp’s horizontal section was too short, which caused damage to their raw material when being offloaded from the shipping containers.

  • Jaclin Engineering was awarded the tender to design and manufacture a 4.0m x 2.4m horizontal platform extension to the existing ramp, rated at 12 tons carrying capacity.
February 2021

Flexible Conveyor Installation

At a well-known food manufacturer in Montague Gardens, Cape Town, Jaclin Engineering carried out the complete installation of a flexible conveyor system on behalf of the Port Elizabeth based OEM. The scope of this project included:

  • Stripping out of the existing system (hopper, fans, ducting, bracketing and supports)
  • Design and manufacture of new supporting stands and specialised bracketing to support the flexible conveyor system’s motors.
  • Installation of the complete flexible conveyor system.
  • Design, manufacture and installation of three new platform and catwalks to allow safe access to the new equipment.

Pre-fabrication of the catwalks and platforms was carried out off-site during weekdays, with all of the installation over weekends so that the client’s production was completely uninterrupted.

August 2020

Conversion of retorts for cans

At a well-known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering designed and carried out the conversion of two retorts, from pouch production to can production. The scope of this project included:

  • Design, manufacture and installation of new stainless steel roller rail assemblies inside the two retorts, for the use of baskets that hold cans
  • Design and fabrication of new stainless steel perforated baskets to hold the cans.
  • Design and fabrication of new stainless steel heavy-duty trolleys to suit the new baskets.
  • Design, and fabrication of three new hydraulic lifting devices to enable lifting and lowering of the new trolleys with their loaded baskets to suit the existing loading and unloading equipment.
June 2020

Generator Enclosures

At a well-known packaging manufacturer in Triangle Farm, Cape Town, Jaclin Engineering designed and constructed two re-enforced concrete bases and vibracrete enclosures for a 550kVa and 850kVa diesel generators, respectively. We also designed and installed a diesel fuel line complete with pump, to supply fuel to both generators.

August 2017

Basket Loader

At a well known pet food manufacturer in Atlantis, Cape Town, Jaclin Engineering built a complete basket loader, which included a conveyor system which feeds the cans of pet food into a basket which, when filled with cans, is placed inside a retort. The basket loader itself included a hydraulic lifting system to allow uniform stacking of the cans.

January 2024

Chilled Water System at Winery

A world-class winery in Grabouw, 80km outside of Cape Town, needed to install a smaller chiller (with lower electrical power consumption), during the loadshedding times. Their main chiller’s electrical consumption was too large for their back-up power supply. Jaclin Engineering designed and installed a new chiller pump and supply/return lines from the standby chiller unit to their hotwell/coldwell tanks. They are now able to run with limited cooling capacity during loadshedding times from their smaller standby chiller unit.

November 2023

Chilled Water System at Winery

A world-class winery in Stellenbosch, 40km outside of Cape Town, needed to upgrade their cooling capacity to their main cellar. Jaclin Engineering designed and installed a new dual-tank (hotwell/coldwell) chilled water system to provide sufficient cooling water to the jacketed wine tanks in their cellar. The chiller’s capacity could handle double the volume of water, so by doubling the tank capacity, Jaclin was able to increase their colling capacity. The scope of the project included the design of the system, installation of pumps, tanks, valves and PVC piping.

November 2022

Chilled Water System at Winery

A world-class winery in Franschhoek, 65km outside Cape Town, installed a second-hand air-cooled chiller and upgraded a section of their chilled water system. Jaclin Engineering designed and installed a new chilled water system to provide cooling to the jacketed wine tanks in their cellar. The scope of the project included the design of the system, installation of pumps, an air-cooled chiller and PVC piping.

October 2022

Chilled Water System at Winery

A world-class winery in Riebeek Kasteel, 80km outside of Cape Town, installed a new water-cooled chiller and upgraded their complete chilled water system. Jaclin Engineering designed and installed a new chilled water system to provide cooling to the jacketed wine tanks in their cellar. The scope of the project included the design of the system, installation of pumps, a water-cooled chiller, cooling towers, filters and all PVC piping.

March 2022

Chilled Water System at Winery

A world-class winery in Grabouw, 80km outside Cape Town, needed to replace their obsolete ammonia chiller and upgrade their complete chilled water system. Jaclin Engineering was awarded the tender to design and install a new chilled water system to provide cooling to all the jacketed wine tanks in their cellar. The scope of the project included the design of the system and installation of tanks, pumps, a water-cooled chiller, cooling tower and all PVC piping, fully lagged.

November 2020

Chilled Water System at Winery

At a well-known winery and producer of world-class wines in Stellenbosch, Jaclin Engineering designed and installed the PVC piping system for the inclusion of the existing glycol mix into the main chilled water system. Two existing pump sets were re-located and the pipework was modified to improve cooling.

We also designed and installed the PVC piping system for the installation of seven new 10,000 ℓ fermentation tanks. Existing chillers and pump sets were retained, but a complete new PVC piping system was installed to provide cooling to the new tanks.

November 2019

Chilled Water System at Winery

At a well-known winery in Franschhoek, Cape Town, Jaclin Engineering designed and installed the PVC piping system for the installation of a new water-cooled chiller to their chilled water system. The installation included a tank and 2 x pumpsets.

March 2019

Chilled Water System at Winery

At a well-known winery in Franschhoek, Jaclin Engineering designed and installed the PVC piping system for the addition of a new water-cooled chiller to their chilled water system.

February 2019

Chilled Water System at Winery

At a brand new winery in Stellenbosch, Cape Town, Jaclin Engineering designed and installed the piping system for a chilled water system

January 2019

Chilled Water System at Winery

At a well-known winery in Darling, Jaclin Engineering designed and installed the PVC piping system for the addition of a new water-cooled chiller to their chilled water system

October 2017

Chilled Water System at Winery

At an exclusive winery in Stellenbosch, Cape Town, Jaclin Engineering designed and installed the piping system for a chilled water system.

June 2017

Chilled Water System

At a well known Sparkling Wine winery in Stellenbosch, Cape Town, Jaclin Engineering replaced a chilled water pump station to increase reliability and efficency of an old chilled water system.

May 2022

Upgrade Clothing Factory (Phase 4)

One of the largest wholesale clothing suppliers in SA, continued with the complete refurbishment of its factory in Epping, Cape Town. For the fourth phase, Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of the full steam, condensate, compressed air and vacuum reticulation systems to supply the necessary stations on the manufacturing lines in the Fourth Production Hall.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
March 2022

Upgrade Clothing Factory (Phase 3)

One of the largest wholesale clothing suppliers in SA, continued with the complete refurbishment of its factory in Epping, Cape Town. For the third phase, Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of the full steam, condensate, compressed air and vacuum reticulation systems to supply the necessary stations on the manufacturing lines in the Second Production Hall.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
February & May 2022

New Clothing Factory (Phase 2 & 3)

One of the largest wholesale clothing suppliers in SA, established a brand-new multi-storey factory in Mobeni, Durban. Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a complete steam system to supply the First and Second Floor production areas.
  • Design of new boiler room and supply and installation of two new steam generators, hotwell, blowdown vessel and water softener.
  • Design, manufacture and installation of a complete compressed air system to supply the First, Second and Fourth Floor production areas.
  • Re-vamping of the existing compressor room and supply and installation of two used compressors and a new air dryer.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
February 2022

Upgrade Clothing Factory (Phase 2)

One of the largest wholesale clothing suppliers in SA, continued with the complete refurbishment of its factory in Epping, Cape Town. For the second phase, Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of the full compressed air reticulation system to supply the necessary machines and fully-automated cutting tables in the Cutting Room.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
December 2021

Textile Company

A 99-year-old company that specialises in the design and manufacture of fine household bed linen and bedding accessories, established a brand-new factory in Diep River, Cape Town.
Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a complete ring-main compressed air system to supply air to the complete 13,000m2 production floor.
  • Design of new compressor room in a container and installation of two compressors and an air dryer.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading textile manufacturer’s new factory.
September 2021

Extension of Clothing Factory

One of the largest wholesale clothing suppliers in SA, established an additional factory adjacent to their existing one in Maitland, Cape Town. Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a complete steam system to supply the new facility.
  • Design of new boiler room and installation of two used steam generators, hotwell, blowdown vessel and water softener.
  • Design, manufacture and installation of a complete compressed air system to supply the new facility.
  • Design of new compressor room and supply and installation of a new compressor, air dryer and air receiver.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
September & December 2021

New Clothing Factory (Phase 1)

One of the largest wholesale clothing suppliers in SA, established a brand-new multi-storey factory in Mobeni, Durban. Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a complete steam system to supply the First and Second Floor production areas.
  • Design of new boiler room and supply and installation of two new steam generators, hotwell, blowdown vessel and water softener.
  • Design, manufacture and installation of a complete compressed air system to supply the First, Second and Fourth Floor production areas.
  • Design of new compressor room and supply and installation of two used compressors and a new air dryer.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
June 2021

New Clothing Factory

One of the largest wholesale clothing suppliers in SA, established a brand-new factory in Caledon, 120km outside of Cape Town. Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of a complete compressed air system to supply the new facility.
  • Design of new compressor room and supply and installation of a new compressor, air dryer and air receiver.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
May 2021

Upgrade of Clothing Factory (Phase 1)

One of the largest wholesale clothing suppliers in SA, started with a complete refurbishment of its recently acquired factory in Epping in May 2021. For the first phase, Jaclin Engineering was awarded the tender for:

  • Design, manufacture and installation of the first sections of “main-line” steam, condensate, compressed air and vacuum reticulation systems to supply all four future Production Halls in the complete facility
  • Design, manufacture and installation of the full steam, condensate, compressed air reticulation systems to supply the necessary stations on the manufacturing lines in the first Production Hall.
  • Design of new boiler room, compressor room and vacuum pump room.
  • Jaclin Engineering’s specialist capability of “design and build” and proven track-record in Clothing and Textiles made them the natural choice for this market leading clothing manufacturer’s new factory.
October 2019

New Upmarket Clothing Factory

A Cape Town exclusive upmarket clothing manufacturer moved its entire factory from Salt River to Epping at the end of 2019/beginning 2020. Jaclin Engineering was awarded the tender for:

  • Design and manufacture of the full steam and condensate reticulation system to supply 110 stations on the Trouser, Shirt and Jacket manufacturing lines.
  • The steam pressure required in the factory necessitated a full pressure reducing station, which was also designed and supplied by us.
  • Design and manufacture of the full vacuum reticulation system to supply 99 stations on the Trouser, Shirt and Jacket manufacturing lines.
  • Design and manufacture of the full compressed air reticulation system and ringmain to supply 187 stations on the Trouser, Shirt and Jacket manufacturing lines, as well as the Cutting Room.
  • Re-location of 2 x compressors and 4 x vacuum pumps from Salt River.
  • Supply and installation of a new air dryer and after-filter.
  • Design and full installation of both new compressor and vacuum pump rooms.
  • Jaclin Engineering worked closely with the TWI International consultants on the factory layout and process flow, as well as providing CAD support.
October 2018

Central Vacuum System

At an upmarket brand clothing manufacturer in Atlantis, Jaclin Engineering designed and installed a new central vacuum system for the factory. The old system that was in use, was fabricated with undersized PVC piping, which resulted oin poor vacuum pressure at the ironing and pressing stations as well as static electricity buildup in the pipes. Jaclin’s new correctly sized mild steel piping system resulted in uniform suction pressure throughout the production floor, resulting in better finished and production efficiencies.

July 2023

Upgrade at Hospital Laundry (Phase 3)

At a local Government Hospital Laundry in Parow, Cape Town Jaclin Engineering was awarded the tender for the design, supply and installation of all utilities to the new equipment and machinery that formed part of Phase 3 of the Laundry upgrade. Our scope included:

  • Civil work – machine bases, plinths, drainage and sections of wall.
  • Offloading and rigging of new equipment into the building.
  • Design, manufacture and installation of steam, condensate and compressed air supplies to each of the new machines.
  • Exhaust ducting for each of the machines requiring it.
August 2022

Equipment Move and Installation at Laundry

A laundry in Epping, Cape Town purchased some used equipment from a Government Hospital Laundry in Cape Town. Jaclin Engineering was awarded the tender for the upliftment, move and re-installation of equipment and machinery. Our scope included:

  • Rigging out, transport and offloading and rigging of new equipment into the building.
  • Design, manufacture and installation of steam, condensate and compressed air supplies to each of the machines.
  • Exhaust ducting for each of the machines requiring it.
April 2022

Upgrade at Hospital Laundry (Phase 2)

At a local Government Hospital Laundry in Parow, Cape Town Jaclin Engineering was awarded the tender for the design, supply and installation of all utilities to the new equipment and machinery that formed part of Phase 2 of the Laundry upgrade. Our scope included:

  • Civil work – machine bases, pinths, drainage and sections of wall.
  • Offloading and rigging of new equipment into the building.
  • Design, manufacture and installation of steam, condensate and compressed air supplies to each of the new machines.
  • Exhaust ducting for each of the machines requiring it.
September 2021

Upgrade at Hospital Laundry (Phase 1)

At a local Government Hospital Laundry in Parow, Cape Town Jaclin Engineering was awarded the tender for the design, supply and installation of all utilities to the new equipment and machinery that formed part of the Laundry upgrade. Our scope included:

  • Civil work – machine bases, pinths, drainage and sections of wall.
  • Offloading and rigging of new equipment into the building.
  • Design, manufacture and installation of steam, condensate and compressed air supplies to each of the new machines.
  • Exhaust ducting for each of the machines requiring it.
August 2021

Utilities Upgrade at Hospital Laundry

At a local Government Hospital Laundry in Parow, Cape Town Jaclin Engineering was called in to assess the condition and efficiency of the vey old steam, air and water utilities. The Laundry was about to embark on a complete upgrade of its production equipment and wanted the existing utilities to at the same level as the state-of-the-art equipment that was being installed.
Jaclin Engineering conducted a detailed survey of the Laundry, and was awarded the tender for:

Steam & Condensate
  • Stripping out all redundant steam and condensate connections.
  • Repairing all steam leaks and replacing all leaking valves.
  • Clad all steam and condensate with stainless steel cladding.
  • Replacing failed steam trapsets and failed valves.
  • Supplying and installing a 250mm steam separator on the main incoming steam supply line.
  • Upsizing of sections of steam and condensate mainlines to accommodate new machinery.
  • Refurbishment of condensate tank, supply of new pumps and level control system.
Compressed Air
  • Design, manufacture and installation of a new 65mm air ring-main